This part counts 10% of afternoon points based on NCEES FE Supplied-Reference Handbook, 8th edition, 2nd revision.
1. Procurement methods.
This section is about design-build, design-bid-build, and qualification based methods.
2. Allocation of resources.
This section is about labor, equipment, materials, money, and time.
3. Contracts and contract law.
4. Project scheduling.
This section is about CPM and PERT.
5. Engineering economics.
6. Project management.
This section is about owner, contractor, and client relationships. It is about safety also.
7. Construction estimating.

No comments:
Post a Comment